What is Retail Electricity Supply?

Retail Electricity Supply (RES) allows large commercial and industrial consumers to purchase electricity directly from licensed retailers.

As a licensed retail electricity supplier, Skye Renewables Philippines Inc. gives eligible contestable customers the freedom to choose their energy source, negotiate competitive rates and, if desired, transition to 100% renewable energy.

Whether you are a manufacturer, office building, data centre, shopping mall or other commercial business, RES gives you control over your energy costs and carbon footprint.

Electricity rates can be fixed-price or indexed-price, suited to your needs.

Skye Renewables as your Retail Electricity Supplier (RES) in Philippines

Eco-friendly business concept with hand analyzing financial charts and green earth globe symbolizing sustainable investment, environmental data analysis and green economy growth. green business.

Tailored Energy Plans

Our energy plans are customized to match the specific needs and consumption patterns of your business, ensuring efficiency and cost-effectiveness.

Two technicians in reflective vests checking solar power plant installed on industrial building roof. Alternative energy source, ecology and carbon footprint reduction concept.

Competitive Pricing

We provide clear, up-front pricing with no hidden fees, allowing you to make informed decisions about your energy spending.

Solar panels and wind turbines generating renewable energy for green and sustainable future.

Sustainable Energy

We are able to provide electricity from renewable energy sources, helping your business reduce its carbon footprint and support sustainability.

Our RES Team

Clarrisa_B_W.jpg
Clarissa Dizon
Head of RES
cdizon@skyerenewables.com
Alyssa_B_W.jpg
Alyssa Calimbas
RES Manager
acalimbas@skyerenewables.com

Ready to Switch to Greener, Smarter Energy?

Speak with our energy advisors to find out if your business qualifies as a contestable consumer and discover how much you could save.

Screenshot_2026-07-08_at_3.15.26_PM.png

Compliance

The RES license held by Skye Renewables - via our wholly-owned entity Skye Renewables Philippines Inc. (SEC No. 2021090024294-05) - is granted by the Energy Regulatory Commission (ERC).

For more information, please refer the ERC and DOE websites at https://www.erc.gov.ph/ and https://doe.gov.ph/ respectively.

Any unresolved complaints or issues can be escalated to the ERC

FAQ

Why should I move my business off captive supply and into the Competitive Retail Electricity Market (CREM)?

Once you qualify as a contestable customer, the CREM gives you the freedom to pick a supplier and a plan that actually fits how your business runs — rather than accepting a one-size-fits-all rate. You can negotiate contract length, payment terms, and pricing structure around your real usage patterns, which is exactly what Skye Renewables helps clients do.

What kind of energy plans and pricing does Skye Renewables offer?

We build each plan around the client, not the other way around. After reviewing your load profile and business goals, we put together a pricing structure and energy mix designed to hit your cost and sustainability targets — no generic packages.

Where does Skye Renewables source its power?

Our portfolio blends conventional generation with renewable sources, so clients can dial in the mix that fits their sustainability commitments and budget.

Do I need be use a minimum amount of electricity?

No. There's no minimum offtake requirement — our contracts are built to flex with your actual consumption, up or down.

What actually changes for my business once I switch to Skye Renewables?

Skye Renewables takes over the generation charge at your agreed contract rate. Distribution and transmission charges are regulated, pass-through costs that continue as normal, but we consolidate them into a single monthly invoice on your behalf as the collecting agent — so you're not juggling separate bills.

Will I need a new power line or connection?

No new line is required. Your existing physical connection with your distribution utility stays exactly as it is — only the supplier of your generation charge changes.

How long does the switch to Skye Renewables take?

Your first switch typically takes up to 90 days to process. After that, subsequent switches move faster — often completed within a month, as long as all documentation is submitted on time.

Will my power be interrupted during the switch?

This depends on your distribution utility. For facilities served by MERALCO, a meter change typically causes no interruption to your power supply.

Official Customer Support

Get in touch.
Email: RES@skyerenewables.com
Address: Skye Renewables Philippines Inc., 26th Floor, The Podium West Tower, 12 ADB avenue Ortigas Center Mandaluyong City 1550

Corporate Governance

PDF
Skye_RESDisclaimer_SkyeRenewablesPhilippinesInc.pdf113 KB
PDF
Skye_RESPrivacyPolicy_SkyeRenewablesPhilippinesInc.pdf129 KB
PDF
RES Customer Complaints Handling Procedure_SkyeRenewablesPhilippinesInc.pdf122 KB